The Department for Transport (DfT) announced a £250m emergency funding package to support active travel. Whilst initial temporary measures are being implemented (phase 1), we are now looking ahead to larger scale works which permanently support active travel and enable a bold step change in Surrey for active travel.
Surrey have submitted a bid for a possible £6.75m in this second phase of works.
Have your sayTo let us know your thoughts on the following proposal, please scroll down to the questions which can be found below the map.
You can also view everyone else's comments, and if you choose to, you can ‘agree’ with them.
About this proposalLocation : The Park Road proposals includes the whole length of Park Road up to where it ties in with Town Lane. This scheme will act as a pedestrian and cycle route connecting Stanwell Moor to Stanwell and beyond to Heathrow Terminal 4 and cargo terminal, Hatton Cross, and other ancillary cargo businesses along Bedfont Road.
Measure/s to be introduced : Although there is an existing shared facility (segregated from motor vehicles) along part of this scheme it is of a very poor quality which could be vastly improved to provide a safe cycle route that people will actually use. The pedestrian environment is also poor and could also be improved to create a viable walking link between the Stanwell Moor and Stanwell. In addition, bus facilities along this road will be improved.
The image below shows the plans in detail. A copy of this can also be downloaded in the 'Additional Materials'.
Map showing extent of works